1 SPECIFICATION & INSTALLATION GUIDE FOR MASPORT LE4000 PROVINCIAL BUILT-IN FIRE, NEW ZEALAND MODEL Part. No. 593398 20.03.2012 Manufactured i
10 Fig. 8 INSTALLATION ON COMBUSTIBLE FLOOR WITH MANTLE SHELF Fig. 9 INSTALLATION ON CONCRETE FLOOR WITH MANTLE SHELF
11 Fig. 10 INSTALLATION - ELEVATED WITHOUT MANTLE SHELF Fig. 11 INSTALLATION ON COMBUSTIBLE FLOOR WITHOUT MANTLE
12 NOTE: It is very important that the space between the flue pipe and the inner casing and the space between the inner casing and the outer casing
13 HEARTH REQUIREMENTS: An insulating floor protector (hearth) is required. The minimum requirement for an insulating floor protector (hearth) is on
14 ELECTRICAL INSTALLATION ALL ELECTRICAL WORK MUST BE CARRIED OUT BY A LICENCED REGISTERED ELECTRICIAN. THE FAN IS TO BE PERMANENTLY CONNECTED TO
15 SLIM AND WIDE FASCIA ASSEMBLY & INSTALLATION FOR LE4000 PROVINCIAL INSERTS If the fascia is not assembled use steps 1-4 to put together f
2 CONTENTS ZERO CLEARANCE BOX (SHIELDING BOX) KIT
3 DIMENSIONS: MODEL D F FF FH FW H W LE4000 PROV BUILT-IN 525 210 315 750 965 696 715 INTRODUCTION In the interest of your safety, building regulato
4 WE RECOMMEND THAT THE INSTALLATION OF YOUR MASPORT SOLID FUEL BURNING APPLIANCE BE CARRIED OUT BY A QUALIFIED INSTALLATION TECHNICIAN. LE4000 PRO
5 STANDARD INSTALLATIONS- FLOOR TO CEILING ENCLOSURE: 1. Inspect the house construction at the proposed installation position to verify that the fl
6 7. Fix the cladding to the front of the enclosure, including down each side of the 719 x 737 opening. All front cladding (including cladding bel
7 12. Cement tiles or slate to the top of the floor protector. The part inside the enclosure will not be visible and therefore does not need comple
8 31. Remove the standard top rail of the fascia and replace it by the vented one. Remove the bottom bar of the fascia and replace it by the vented
9 Fig. 7
Kommentare zu diesen Handbüchern